Friday, September 27, 2013

09-27-2013 Ride

Early morning ride before work, leaving home a little before 6:30.  It was cold at the start, about 50 deg.  I rode by work, not much gas in the tank on this little climb.  Then over to Camino del Norte and connecting to Carmel Mountain Rd.  I went down to Poway Rd via Rancho Carmel Dr/Sabre Springs Pkwy, then back to Pomerado Rd via Oak Knoll Rd.  Around this time, I met up with a guy who was riding in to work from Chula Vista (!).  I led out for him for basically the entire stretch down to the freeway.  I would get away from him on any of the little uphill sections, then he would catch up at a light or on the downhills.  He was appreciative of the pulls I gave him, and his presence caused me to put more effort into this part of the ride than I would have otherwise.  I finished with a little bit of struggle on the last two little climbs, working myself back into decent cycling shape.

Avg speed = 17.8 mph. Total mileage = 20.1 mi
Avg heartrate = 148 bpm
Total elevation gain = 600'