Wednesday, April 30, 2014

04-30-2014 Ride

Posted this long afterwards.  Ride after work. where I headed out Bernardo Center Dr to Carmel Valley Rd, staying on it all the way until it dead-ended at the 56.  Then I took the 56 bike path back to Black Mountain Rd, turning left there and riding back to Carmel Valley Rd, where I turned right.  Up and over the crest, then down to Dove Canyon Rd, where I turned left and took it over to RB Rd.  Back to campus using Via del Campo.

Avg speed = 16.3 mph. Total mileage = 20.8 mi
Total elevation gain = 1610'

No comments: